We have been informed by APS that they have completed installation of the new power cables and intend to cut-over power to the new cable on Thursday morning sometime between 8 AM and 9 AM. APS expects power may be out for 15 to 30 minutes while the permanent connections are made.
Thank you,
Brett Gerasim
RVH HOA President