Emergency Traffic Alert – 10/3/22

03 Monday Oct 2022

Posted by RVH Board in Improvements, Roads

≈ Comments Off on Emergency Traffic Alert – 10/3/22

Cactus Asphalt has begun the fog seal process for all RVH roads, as was promised earlier in the year. Please exercise caution as road crews apply the fog seal. The process should be completed by end of day. Thank you for your cooperation.

Brett Gerasim

RVH HOA President

Share this:

  • Twitter
  • Facebook

Like this:

Like Loading...

Traffic Alert – Main Entrance Closure 9/10 4am-6am

08 Thursday Sep 2022

Posted by RVH Board in Roads

≈ Comments Off on Traffic Alert – Main Entrance Closure 9/10 4am-6am

It has become necessary to perform storm related maintenance at the Rio Vista Hills main entrance archway. The work will necessitate complete closure of the main entrance roadway to all traffic. To minimize inconvenience to our residents, this work is planned to be performed between the hours of 4 AM and 6 AM this Saturday morning, September 10.


For those residents who have no option but to leave or enter RVH during the main entrance closure, the RVH emergency entrance will be open to single lane traffic. The emergency entrance/exit roadway is located at the southerly end of N 295 th Avenue and after passing through the normally closed gate, extends on downhill to Hwy 60. Please use caution as our emergency roadway is a single lane with no room for passing oncoming vehicles.

Thank you in advance for your patience and cooperation.

Brett Gerasim
RVH HOA President

Share this:

  • Twitter
  • Facebook

Like this:

Like Loading...

Fogsealing Postponement

26 Sunday Jun 2022

Posted by RVH Board in Roads

≈ Comments Off on Fogsealing Postponement

Originally scheduled for Monday, June 27, the fogsealing operation has been postponed with a target date of September 2. Cactus Asphalt informs us that the liquid asphalt sealant will not cure properly in the high summer temperatures. We have been assured that the delay in applying the fogseal coating will not affect the longevity or durability of our newly resurfaced roads.

We will send out a notice prior to the fogsealing operation.

On behalf of the Board, thank you for your patience and cooperation.

Brett Gerasim
RVH HOA Board President

Share this:

  • Twitter
  • Facebook

Like this:

Like Loading...

Chipseal of All RVH Roads Begins 6/22

15 Wednesday Jun 2022

Posted by RVH Board in Improvements, Roads

≈ Comments Off on Chipseal of All RVH Roads Begins 6/22

Dear RVH HOA Members and neighbors,

Chipsealing of all RVH roads is scheduled to begin Wednesday June 22, and will be completed the next day. Fogsealing, a coating of asphalt sealant applied over the new chipseal, is scheduled to be applied Monday, June 27.

During these operations residents are encouraged to avoid using the roads. If you must go out, expect delays and possible accumulation of liquid asphalt on tires and painted surfaces of your vehicle. Warn your scheduled contractors, landscapers, etc. not to visit during construction. Keep pets clear of the fresh asphalt. If you walk the roads, remember to check your shoes before heading inside. Asphalt on painted surfaces can be removed with mineral spirits. The contractor is not responsible for damage or inconvenience.

Cactus Asphalt performed the most recent chipsealing of our roads and has been selected this time as well. They will be using state of the art equipment and methods of application. Pre-coated MAG (Maricopa Area Governments) specification fractured stone will be used throughout the project. The binding asphalt is produced using 10 percent recycled tire rubber for added strength, increased traction, and quiet travel. Expected service life is between seven and ten years.

On behalf of the Board, thank you for your patience and cooperation.

Brett Gerasim
RVH HOA Board President

Share this:

  • Twitter
  • Facebook

Like this:

Like Loading...

Traffic Alert – 3/29 – 4/2/22

26 Saturday Mar 2022

Posted by RVH Board in Around the Neighborhood, Improvements, Roads

≈ Comments Off on Traffic Alert – 3/29 – 4/2/22

On Tuesday, 3/29,  thru Saturday, 4/2, one of our landscape contractors, Trees for Needs, will be working along our roadways. They will be cutting back vegetation and clearing lines of sight throughout Rio Vista Hills.

When approaching and driving through the work areas, please drive slowly, be patient and be alert to the movement of personnel and equipment. The crews will do their best to minimize delays to traffic.

Thank you,
Brett Gerasim

RVH HOA President

Share this:

  • Twitter
  • Facebook

Like this:

Like Loading...

Traffic Alert – Erosion Repairs on N. 296th Ave – 1/6/22

04 Tuesday Jan 2022

Posted by RVH Board in Roads

≈ Leave a comment

The work at the erosion sites on N 296th Ave that was supposed to happen on Monday, January 3rd, failed to occur. The work crews from Cactus Asphalt showed up, but the cement and rock deliveries failed to happen.

We have been informed that the rock delivery is now expected on January 6th . Please be on alert that work crews may be present at the erosion site on N 296th Ave on that day and possibly on subsequent days. Cactus has been unable to confirm a delivery date for the cement grout that remains to be applied to the rock spillway.

Lacking the ability to forecast these materials deliveries, we can only ask that you please be prepared for the presence of work crews at that site without notice. The Board will provide you with updated information as soon as we have it.

When approaching and driving through the work area, please drive slowly and be patient and be alert to the movement of personnel and equipment. The crews will do their best to minimize delays to traffic.

Thank you,
Brett Gerasim
RVH HOA President

Share this:

  • Twitter
  • Facebook

Like this:

Like Loading...

Traffic Alert for N 296th Ave – Monday, 1/3/22

30 Thursday Dec 2021

Posted by RVH Board in Roads

≈ Leave a comment

On Monday, January 3rd, work crews from Cactus Asphalt will be on-site to complete their work at the erosion sites on N 296 th Ave. A cement truck and workers will be present for a portion of the day to add a grout mixture to the new rock spillway. Also, additional riprap will be added to the gutter along the road edge opposite the spillway. The work is expected to be completed the same day. The crews will do their best to minimize delays to traffic.


Residents are requested to please reduce travel speeds and use caution when approaching the workers and equipment.


Thank you,
Brett Gerasim
RVH HOA President

Share this:

  • Twitter
  • Facebook

Like this:

Like Loading...

Traffic Alert – 12/7 – 12/17

07 Tuesday Dec 2021

Posted by RVH Board in Roads

≈ Comments Off on Traffic Alert – 12/7 – 12/17

APS unexpectedly started work this morning on a line replacement project.

The project begins approximately at Jim Stevens’ driveway and extends up 296th Ave to Mike Reilly’s driveway. The project is scheduled to be completed around the 17th, but difficult digging may extend this estimate. Traffic control personnel are in place.


As always, residents are requested to please reduce travel speeds and use caution when approaching the workers and equipment.

Thank you,
Brett Gerasim
RVH HOA President

Share this:

  • Twitter
  • Facebook

Like this:

Like Loading...

Reminder: Upcoming Crack Seal 11/3 – 11/4

01 Monday Nov 2021

Posted by RVH Board in Roads

≈ Leave a comment

Reminder: On Wednesday November 3 rd at 8 AM, work crews from Cactus Asphalt will be on-site to start the crack sealing repairs to all the RVH roads. The work is expected to be completed by 5 PM on Thursday November 4th.

The exact route and sequence of operations will be determined by the work crews at the time the work begins. It is suggested residents plan on minimizing their use of the roads on those days to the extent possible. The sealant, which is a hot rubberized polymer mixture, will be set to drive across within 15 to 30 minutes. So please be patient. The crews will do their best to minimize delays to traffic.


Residents are requested to please reduce travel speeds and use caution when approaching the workers and equipment.


Your patience with these needed repairs is appreciated.


Thank you,
Brett Gerasim
RVH HOA President

Share this:

  • Twitter
  • Facebook

Like this:

Like Loading...

Traffic Alert – N 296 th Ave Erosion Repairs Monday Oct 11 thru Friday Oct 15

10 Sunday Oct 2021

Posted by RVH Board in Roads

≈ Comments Off on Traffic Alert – N 296 th Ave Erosion Repairs Monday Oct 11 thru Friday Oct 15

On Monday, Oct 11 th at 8 AM, work crews from Cactus Asphalt will be on-site to start working on repairs at the erosion damage on N 296 th Ave. The work is expected to continue throughout the week. Large equipment and large trucks delivering rock and cement will be present at various times. Momentary stoppage of traffic will be unavoidable. Please be patient. The crews will do their best to minimize delays to traffic.


Residents are requested to please reduce travel speeds and use caution when approaching the workers and equipment.


Thank you,
Brett Gerasim
RVH HOA President

Share this:

  • Twitter
  • Facebook

Like this:

Like Loading...
← Older posts

Subscribe

  • Entries (RSS)
  • Comments (RSS)

Archives

  • December 2022
  • October 2022
  • September 2022
  • June 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • July 2021
  • June 2021
  • February 2021
  • December 2020
  • June 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • August 2019
  • March 2019
  • February 2019
  • May 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2017
  • August 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • November 2016
  • March 2016
  • February 2016
  • January 2016
  • November 2015
  • May 2015
  • February 2015
  • January 2015
  • November 2014
  • January 2014
  • December 2013
  • September 2013
  • January 2013
  • December 2012
  • July 2012

Categories

  • Annual Meeting
  • Around the Neighborhood
  • Improvements
  • Introduction
  • Meetings
  • Resources
  • Roads
  • Uncategorized

Meta

  • Register
  • Log in

Blog at WordPress.com.

  • Follow Following
    • Rio Vista Hills HOA
    • Already have a WordPress.com account? Log in now.
    • Rio Vista Hills HOA
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
%d bloggers like this: